翻訳と辞書
Words near each other
・ Saturnino Manuel de Laspiur
・ Saturnino Martínez
・ Saturnino María Laspiur
・ Saturnino Ohure
・ Saturnino Osorio
・ Saturnino Perdriel
・ Saturnino Rustrián
・ Saturnino Álvarez Bugallal
・ Saturninus
・ Saturninus (253–268)
・ Saturninus (consul 383)
・ Saturn B-1
・ Saturn Bomberman
・ Saturn Bomberman Fight!!
・ Saturn C-2
Saturn C-3
・ Saturn C-4
・ Saturn C-5N
・ Saturn C-8
・ Saturn Club
・ Saturn Communications
・ Saturn Corporation
・ Saturn Curve
・ Saturn Cycling Team
・ SATURN Development Group
・ Saturn Devouring His Son
・ Saturn Disk Image
・ Saturn Electronics
・ Saturn FC
・ Saturn Films


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Saturn C-3 : ウィキペディア英語版
Saturn C-3

|family = Saturn
|derivatives = Saturn INT-20, Saturn INT-21
|comparable = Falcon Heavy, Delta IV Heavy
|status = Proposed (1961)
|sites = planned SLC 37, Kennedy Space Center
|stagedata=
}}
The Saturn C-3 was the third rocket in the Saturn C series studied from 1959 to 1962. The design was for a three-stage launch vehicle that could launch 45,000 kg (100,000 lb) to low Earth orbit and send 18,000 kg (39,000 lb) to the Moon via Trans-Lunar Injection.
President Kennedy's proposal on May 25, 1961 of an explicit manned lunar landing goal spurred NASA to concretize its launch vehicle requirements for a lunar landing. A week earlier, William Fleming (Office of Space Flight Programs, NASA Headquarters) chaired an ad hoc committee to conduct a six-weeks study of the requirements for a lunar landing. Judging the direct ascent approach to be the most feasible, they concentrated their attention accordingly, and proposed circumlunar flights in late 1965 using the Saturn C-3 launch vehicle.
In early June 1961, Bruce Lundin, deputy director of the Lewis Research Center, led a week-long study of six different rendezvous possibilities. The alternatives included earth-orbital rendezvous, lunar-orbital rendezvous, earth and lunar rendezvous, and rendezvous on the lunar surface, employing Saturn C-1s, C-3s, and Nova designs. Lundin's committee concluded that rendezvous enjoyed distinct advantages over direct ascent and recommended an earth-orbital rendezvous using two or three Saturn C-3s.
NASA announced on September 7, 1961 that the government-owned Michoud Ordnance Plant near New Orleans, LA, would be the site for fabrication and assembly of the Saturn C-3 first stage as well as larger vehicles in the Saturn program. Finalists were two government-owned plants in St. Louis and New Orleans. The height of the factory roof at Michoud meant that a launch vehicle with eight F-1 engines (Nova class, Saturn C-8) could not be built; four or five engines would have to be the maximum.
This decision ended consideration of a Nova class launch vehicle for Direct Ascent to the Moon or as heavy-lift companion with the Saturn C-3 for Earth Orbit Rendezvous.
==Lunar mission design==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Saturn C-3」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.